- 摘 要
-
(1 浙江省建筑科學(xué)設(shè)計研究院建筑設(shè)計院, 杭州 310012;
2 浙江建筑特種技術(shù)工程公司, 杭州 310012)
[摘要]分析了某地下室上浮的原因及其構(gòu)件的破壞機理,采取地下室底板增設(shè)預(yù)應(yīng)力巖石錨桿等補救措施,并從實際施工和工程造價上優(yōu)化抗浮措施的細(xì)部節(jié)點,多快好省地解決了此次工程事故,使工程得以順利交付使用。
[關(guān)鍵詞]上浮; 裂縫; 預(yù)應(yīng)力自鎖錨桿; 錨桿檢測
中圖分類號: TU398.7 文獻(xiàn)標(biāo)識碼: A文章編號: 1002-848X(2016)S1-0728-04
Project of the uplifting processing of a basement
Wang Jingmin1, Shen Jing2
(1 Architectural Design Institute of Zhejiang Academy of Building Research & Design, Hangzhou 310012, China;
2 Zhejiang Special Construction Engineering Co., Ltd., Hangzhou 310012, China)
Abstract: The reasons of a floating basement and the failure mechanism of its members were analyzed. Some remedial measures were taken, such as an additional basement prestressed, rock anchor and so on. The connection details of anti-floatation measures in aspects of the actual construction and project cost were optimized. The engineering accident was solved better and more economical, so that the project can be successfully delivered.
Keywords: float; crack; prestressed self-locking bolt; bolt detection
作者簡介: 王靜民,高級工程師,一級注冊結(jié)構(gòu)工程師,Email:370108720@qq.com。