- 摘 要
-
(中國電力科學(xué)研究院, 北京 100055)
[摘要]長短腿配置方案通常由線路結(jié)構(gòu)人員進(jìn)行設(shè)計,但需要在勘測人員繪制的塔基斷面圖的基礎(chǔ)上進(jìn)行。基于測量、結(jié)構(gòu)人員協(xié)同一體化設(shè)計的設(shè)計理念,提出一種自動繪制塔基斷面圖,并根據(jù)塔基斷面圖自動配置長短腿高低基礎(chǔ)的方法?;赥eigha技術(shù)開發(fā)塔基斷面圖自動出圖以及長短腿自動配置軟件,實現(xiàn)測量、結(jié)構(gòu)人員的協(xié)同設(shè)計,達(dá)到塔基斷面圖自動出圖以及長短腿自動配置的目的。
[關(guān)鍵詞]協(xié)同設(shè)計; 塔基斷面圖; 長短腿自動配置; 自動出圖
中圖分類號: TM7 文獻(xiàn)標(biāo)識碼: A文章編號: 1002-848X(2016)S1-1013-05
Study on automated mapping system of tower base sectional drawing and automated
design of unequal leg based on Teigha
Wang Yi, Fang Zhenggang, Jin Huan, Ma Xiao
(Chinese Electric Power Research Institute, Beijing 100055, China)
Abstract: The unequal leg is usually designed by structural engineers using the tower base sectional drawing which was drew by surveyors. With the concept of collaborative integrated design between structural engineers and surveyors, automated mapping system of tower base sectional drawing was proposed. Base on the tower base sectional drawing, automated design system of unequal leg was proposed. By using Teigha, the collaborative integrated design between structural engineers and surveyors was realized.
Keywords: collaborative integrated design; tower base sectional drawing; automated design of unequal leg; automated mapping system
作者簡介: 王軼,碩士,工程師,Email:wangyi-moon@163.com。*國家電網(wǎng)公司科技項目(GC71-13-042)。