- 摘 要
-
(廣州容柏生建筑結(jié)構(gòu)設(shè)計(jì)事務(wù)所, 廣州 510170)
[摘要]介紹了廣州金融城某地塊地下室的基礎(chǔ)和結(jié)構(gòu)設(shè)計(jì)。對(duì)抗拔錨桿方案的影響因素進(jìn)行量化分析,為抗浮設(shè)計(jì)的優(yōu)化提供依據(jù)。詳細(xì)分析了地下室超長混凝土結(jié)構(gòu)在考慮混凝土收縮和使用階段溫差情況下的應(yīng)力情況,并根據(jù)分析結(jié)果采取針對(duì)性的設(shè)計(jì)工作。為節(jié)省工期,采用跳層施工方案,設(shè)計(jì)中采取相應(yīng)的構(gòu)造措施并進(jìn)行施工階段驗(yàn)算,確保了方案合理可行。
[關(guān)鍵詞]地下室; 抗拔錨桿; 超長混凝土結(jié)構(gòu); 跳層施工
中圖分類號(hào):TU470, TU318-2文獻(xiàn)標(biāo)識(shí)碼:A文章編號(hào):1002-848X(2017)16-0084-05
Discussions on some problems in foundation and structural design of the basement for certain plot in Guangzhou Financial City
Yi Yufeng, Zhao Qing
(RBS Architectural Engineering Design Associates, Guangzhou 510170, China)
Abstract:The foundation and structural design of the basement for certain plot in Guangzhou Financial City were introduced. Quantitative analysis of the influential factors on the scheme of the uplift anchor was conducted to provide the basis for the optimization of anti-floating design. The stress conditions of the super-long concrete structure of the basement were analyzed in detail considering the conditions of the concrete shrinkage and temperature difference in service stage. Design work was conducted according to the results of analysis results. Skipping-floor construction scheme was used for save time, and the corresponding structural measures were taken in design and construction phase checking was conducted to make sure that the scheme was feasible and reasonable.
Keywords:basement; uplift anchor; super-long concrete structure; skipping-floor construction
作者簡介:裔裕峰,碩士,工程師,一級(jí)注冊(cè)結(jié)構(gòu)工程師,Email:723381331@qq.com。