吳二軍 李愛群 陳道政
(東南大學(xué)土木工程學(xué)院 南京 210096)[提要] 江都市供電局生產(chǎn)調(diào)度綜合樓為框架和磚混組合結(jié)構(gòu),2002年7月對(duì)該綜合樓進(jìn)行了雙向整體平移。詳細(xì)介紹了該工程中整體移動(dòng)、托換、軌道和新基礎(chǔ)及就位連接設(shè)計(jì)方案的選擇過程,提出了平移工程設(shè)計(jì)方案選擇的一些建議。
[關(guān)鍵詞] 雙向整體平移 組合結(jié)構(gòu) 托換 就位連接 設(shè)計(jì)The Jiangdu power supply building is a composite louilding with frame and masonry structure.The building was two-direction monolithicly moved to new place in July, 2002. The process of design plan choosing is introduced and discussed in detail, and suggestions are given. These key steps include moving, underpinning, track and new foundation, and linking with new foundation.
Keywords: two-direction monolithic movement; composite structure; underpinning; link; foundation; design