延安某辦公樓的工程事故分析和托換加固處理
林本海
- 摘 要
-
林本海
(廣東省建筑設(shè)計研究院 廣州 510010)[提要] 分析了延安某辦公樓工程事故的原因,并根據(jù)砌體結(jié)構(gòu)研究成果,考慮到地基基礎(chǔ)和上部結(jié)構(gòu)共同工作的可能性,采用了灰土井墩托換加固方案,實(shí)踐證明,該托換加固處理是成功的。
[關(guān)鍵詞] 辦公樓地基事故 新近堆積黃土 灰土井墩托換加固 共同工作Analyzing the characteristics of cracks distribution in a two-storied building the piers underpining strengthening method is proposed. Considering interaction of soil-foundation-upper wall, piers with a distance of 6.Om are adopted. The results of settlement observation and the test of two rainy seasons show that the strengthing of the building is proved successfully.
Keywords: building cracks; Holocene slope wash of loess; pier underpining method;interaction
- 下載地址
-