- 摘 要
-
鐘 煉, 陸余年
(上海建筑設(shè)計(jì)研究院有限公司,上海 200041)[摘要] 義烏三鼎廣場由2棟獨(dú)立塔樓組成,其中萬豪酒店為框架.核心筒結(jié)構(gòu)體系,開元酒店為框架.剪力墻結(jié)構(gòu)體系;裙房屋頂均設(shè)游泳池采用大跨度預(yù)應(yīng)力梁支承,地下4層深基坑,抗浮設(shè)計(jì)結(jié)合當(dāng)?shù)亟?jīng)驗(yàn)采取抗拔巖層錨桿。
[關(guān)鍵詞] 高層建筑;框架.核心筒;大跨度預(yù)應(yīng)力梁;抗拔錨桿;軟弱夾層地基處理
中圖分類號:TU973 文獻(xiàn)標(biāo)識碼:A 文章編號:1002-848X(2012) Sl-0299-04Structure design of Yiwu Sanding Square
Zhong Lian, Lu Yunian
( Shanghai Institute of Architectural Design&Research( Co., Ltd.),Shanghai 200041, China)Abstract: Yiwu Sanding Square is composited by 2 independent towers. The Mamott Hotelis a frame-corewall structure, the New-century Hotelis a frame-shearwall structure. Podium roofs are equipped with swimming pools which are supported by large span prestressed beams. Deep foundation pit is 4 floors deep. Basis on the local experience, uplift anchors are used to resist the buoyant force.
Keywords: high-rise building; frame-corewall structure; large span prestressed beam; uplift anchor; foundation treatment of the weak interlayer
- 下載地址
-