- 摘 要
-
褚青青1,孫柏鋒2
(1 昆明市建筑設(shè)計研究院有限責(zé)任公司,昆明650011; 2 云南恒銳建設(shè)技術(shù)咨詢有限公司,昆明650011)[摘要] 以某高層建筑為例,通過引入隔震結(jié)構(gòu)兩階段設(shè)計法,對確定上部結(jié)構(gòu)的減震效果以及水平位移控制進(jìn)行了有益的探索和嘗試,高層建筑隔震后同樣能達(dá)到很好的減震效果。隔震結(jié)構(gòu)兩階段設(shè)計法簡單實用,有利于縮短設(shè)計周期,提高工作效率。
[關(guān)鍵詞] 高層結(jié)構(gòu);隔震設(shè)計;兩階段設(shè)計法;簡化估算方法;時程分析Application of high-rise structure isolation design in the high intensity seismic region
Chu Qingqing1, Sun Baifeng2
(1 Kunming Architectural Design and Research Institute Co.,Ltd., Kunming 650011, China; 2 Yunnan Hiever Construction Consult Co.,Ltd., Kunming 650011, China)Abstract: Two processes design method was provided for isolated buildings. Taking a high-rise building for example, proposed to determine the isolation effect and the control of the horizontal displacement, it was a useful exploration used isolation techniques for the high-rise building. The computation result shows the method is simple and practical. This method is advantageous to enhance design quality and reduce design period.
Keywords: high-rise building; seismic isolation design; two processes design method; simplified estimation method; time-history analysis